| Technical Process |
Selecting
|
1. Arrange materials according to different timbers, specifications and sizes. 2. Make sure that timbers are not suffered from moth, mildew and nigrescence. |
Drying
|
1. Make sure of pile-up density according to different specifications and humidity of timbers. 2. Dry at different time and under different temperature according to different timbers and different temperatures. 3. Timber can be taken out of drying chamber until the rate of containing water or moisture is below 15%. |
Cut components
|
1. Cogging Procedures: opening finish plane breaking.
2. All-round examination for cogging. 3. Testing items for semi-finished products. Surface: being flat and slippery, with no burr and crack. Sizes: conforming to customer's final confirmed sample or drawing. |
Painting
|
1. Painting Procedures: Polishing - Priming - Polishing - Blowout. 2. The sand and painting Surface: being flat and slippery, with no mottle and crack. |
Silk-Screen Printing
|
1. The purchased paint and ink should be confirmed to be nontoxic before use by authoritative quality inspection organizations. 2. Lacquering Standard Surface: conforming to customer's requirements on brightness, surface being slippery, evenly painted, with no fading and paint remains. Color: conforming to customer's final confirmed sample, with no chromatic aberration in the same lot.
3. All finished products are subject to all-round examination by quality inspection department. |
Assembly
|
Assembly standard: Check all of the parts of finished products. Test whether these small parts are easy to break off or not, otherwise children will englut these parts and it's very dangerous. |
Packing
|
Package Examination:
Auxiliary Materials: the label, color box, bar code and etc. should conform to the product and contract stipulations. Quantity: conforming to the quantity stipulated in contract. |
Warehousing
|
Finished products are warehoused only after they are certified to sampling examination by factory's quality inspection department. |